Dyson Energy Services
Read all reviews for Dyson Energy Services →
How long
Around July 2015 Dyson Commenced work on my property to install external wall insulation. This job is usually two to three weeks. The completion date was 16/05/2016. The job was a shambles from start to finish with delay after delay and excuse after excuse. Some time after completion I noticed a damp patch on my kitchen wall, the damp got worse and worse. I had contractors do a survey on my roof to see if that was the problem, it was not. It was by chance I discovered the toilet cistern was overflowing, it was only then I realised that my overflow pipe had not been extended beyond the cladding. In fact it had been cut off at the brickwork and cladded over. This had resulted in water running between brickwork and cladding causing saturation of the brickwork. Dyson admitted responsibility but failed to act on recommendations from a survey I had conducted. Dyson plastered and redecorated the internal wall despite survey recommendations that cladding should be removed to allow the brickwork to air dry. Within weeks the wallpaper had fallen off. It is now over a year since remedial work started and it is still ongoing.